For the complete documentation index, see llms.txt. This page is also available as Markdown.

Implementation Status

Measured 21 August 2026.

This section is the factual position of the Gavedu network today. The rest of this paper describes a design. Where any other page reads as though a programme is running, this page is the one that is correct.

Component
Status as of 21 August 2026

GVDT token on Base

Deployed and live. Fixed 100,000,000,000 supply, non-mintable.

On-chain node registry

Deployed. totalNodes() currently returns 29. These are registration records written to a contract — they are not proof that a node is powered on or serving traffic.

Physical nodes serving traffic

None currently online.

Ad revenue collected to date

Zero. No advertiser has ever been billed and no ad revenue has ever been received.

PDO staking contract

Does not exist. Not written, not deployed.

PDO vesting vault

Does not exist. No GVDT has ever vested or been released to any operator.

Uptime oracle

Does not exist. No node uptime has ever been measured on-chain.

Investor staking programme

Does not exist. No stake has ever been accepted and no node has ever been funded this way.

Consumer reward points

The only mechanic that has ever run. Off-chain points have been credited for ad views and burned when spent.

What this means for a reader

  • The PDO reward programme and the investor staking programme described in this paper are designs. They are not open, not contracted, and not funded.

  • This paper makes no return-of-capital promise, no yield promise, and no price or profit prediction. Nothing here should be read as an offer or as a representation that any earning mechanism is available.

  • No completion date is given for any unbuilt component, because no such date has been committed.

The token contract and the tokenomics table elsewhere in this paper are facts and are independently verifiable on Base. The economic programmes are not yet facts.

Last updated